State

Delegation Led By Principal Secy To PM Oversees Ongoing Rescue Operations In Uttarkashi

Uttarkashi (Uttarakhand) [India]: A delegation led by Principal Secretary to Prime Minister, Pramod Kumar Mishra took stock of ongoing efforts to rescue 41 trapped workers in Silkyara tunnel in Uttarkashi on the 16th day of the operations.

Union Home Secretary Ajay Kumar Bhalla and Uttarakhand Chief Secretary SS Sandhu along with Pramod Kumar Mishra inspected the work inside the tunnel.

The Principal Secretary also enquired about the food items sent to the workers trapped inside the tunnel. PK Mishra also spoke to the trapped workers and their families.

Micro tunnelling expert Chris Cooper said earlier today that all the debris of the auger machine has been removed and manual drilling to reach the trapped labourers will start in a few hours.

The auger machine being used for horizontal drilling of the tunnel that got stuck inside the pipe was cut and removed using a plasma cutter, on Monday morning.

Vouching for the manual method, former Army Engineer-in-Chief, Lieutenant General Harpal Singh (Retd), told media that there is no other way left except the manual method to reach the trapped workers.

Singh said that he reached the site to provide technical inputs and further aid the ongoing rescue operations. He added that efforts are made on all fronts to speed up the rescue process.

As per official sources, the rat hole mining technique will be used through manual drilling to remove the debris inside the pipe to accelerate the rescue.

The rat hole mining technique is generally used in coal mining, especially in regions that have difficult terrain.

A team of 6 specialists have reached the site to undertake the manual drilling work and a team of 11 people will go inside the 800 mm pipe of the tunnel to remove the debris manually. The team includes engineers from the Indian Army’s Madras Engineering Group as well as civilians.

In collaboration with the Border Road Organisation and other agencies, efforts are also underway to enter from the other mouth of the tunnel that is the Barkot side. Four blasts were undertaken under the supervision of BRO and so far only 10 metres out of 500 meters have been covered.

Also, the rescuers are planning to build a mini tunnel along the left side of the tunnel, horizontal but perpendicular to the Silkyara tunnel, the work of which will be undertaken by SJVN.

After a portion of the tunnel caved in on November 12, the debris falling in the 60-metre stretch on the Silkyara side of the tunnel trapped 41 labourers inside the under-construction structure.

Admin

Recent Posts

Aryan Khan Secures No. 2 Spot on IMDb’s Most Popular Indian Directors List

Just over two months after the premiere of his directorial debut, the Netflix series The…

15 hours ago

Ram Gopal Varma Defends Comments on Actresses, Calls Them “Praise, Not Objectification”

Filmmaker Ram Gopal Varma (RGV) has once again stirred controversy by defending his descriptive comments…

16 hours ago

Kim Kardashian Reclaims Narrative, Confronts Robbers “Dripping in Diamonds”

Nine years after her terrifying 2016 Paris robbery, Kim Kardashian made a powerful statement of…

17 hours ago

Aishwarya Rai Bachchan: Motherhood and Conviction Guide Career at Red Sea Film Festival

Bollywood icon Aishwarya Rai Bachchan captivated the audience at the Red Sea Film Festival 2025…

17 hours ago

Which One is better for you amid current toxic air pollution levels: A1 or A2 milk?

Amid concerns over air pollution stressing the body, the choice of dairy milk can play…

18 hours ago

How IndiGo crisis sent nationwide airports into meltdown

India's largest airline, IndiGo, is facing an unprecedented operational crisis, with over 1,000 flights cancelled…

18 hours ago