Jaipur Metro Phase-2 Cleared: Cabinet Approves ₹13,037 Crore North-South Corridor

Must read

- Advertisement -

NEW DELHI — In a major push for urban infrastructure and renewable energy, the Union Cabinet, chaired by Prime Minister Narendra Modi, on Wednesday approved the Jaipur Metro Phase-2 project. The new 41-km North-South corridor is set to transform connectivity in the Pink City with a total investment of ₹13,037.66 crore.

  1. The Jaipur Metro Phase-2 Blueprint
    Union Minister Ashwini Vaishnaw announced that the project will be a 50:50 joint venture between the Centre and the Rajasthan government, executed by Rajasthan Metro Rail Corporation Limited (RMRCL).

The Route: Stretching from Prahladpura to Todi Mod, the corridor features 36 stations (34 elevated and 2 underground).

Key Hubs: It will link critical areas including the Sitapura Industrial Area, Tonk Road, SMS Hospital, and Vidhyadhar Nagar. Notably, underground stations near Jaipur Airport will provide seamless access for air travelers.

Interconnectivity: The line will interface with the existing Phase-1 (Mansarovar to Badi Chaupar), creating a comprehensive transit network for a city whose population is projected to reach one crore.

- Advertisement -

Timeline: The project is slated for completion by September 2031.

  1. Arunachal Pradesh: Energy Security Boost
    The Cabinet also cleared two massive hydroelectric projects in Arunachal Pradesh to strengthen the national grid and regional infrastructure:

Kamala Hydro Electric Project: A 1,720 MW project on the Subansiri river, costing ₹26,070 crore.

Kalai-II Hydro Electric Project: A 1,200 MW project in the Lohit basin, costing ₹14,106 crore.

Impact: Chief Minister Pema Khandu emphasized that these projects will drive job creation and infrastructure in remote districts like Anjaw.

Key Cabinet Approvals (April 8, 2026)

ProjectLocationCapacity/ScaleEstimated Cost
Jaipur Metro Ph-2Rajasthan41 km (36 Stations)₹13,037.66 Cr
Kamala HydroArunachal1,720 MW₹26,070.00 Cr
Kalai-II HydroArunachal1,200 MW₹14,106.00 Cr
- Advertisement -

More articles

Latest article