Top

Uttarkashi Tunnel Rescue: CM Dhami Tracks Ops From Temporary Office Camp At Matali

Uttarkashi (Uttarakhand) [India]: As merely a few metres separated the rescuers and the trapped workers in the collapsed portion of the under-construction of the Silkyara tunnel in Uttarkashi, a temporary camp office was put together at Matali for Chief Minister Pushkar Singh Dhami to monitor the ongoing operation real-time.

According to an official release on Friday, CM Dhami was closely tracking the ongoing efforts to safely extract 41 labourers, who were trapped after a portion of the tunnel on the Uttarkashi-Yamnotri road caved in on November 12.

Apart from monitoring the rescue operation, the chief minister is also in regular contact with officers on the spot, issuing directions from time to time.

Drones are also being used to keep track of the situation in the Uttarkashi tunnel, officials said on Friday.

The ongoing rescue work entered its 13th day on Friday, with the trapped workers deemed safe and in good spirits.
They are being provided with regular meals and counselling.

“We are here to support the rescue team, which is working tirelessly. Our priority is to ensure the safety of the trapped labourers which is why we have deployed drones so that we can monitor their status real-time. The drones are equipped with advanced technology and can capture real-time images inside tunnels. It is also equipped to operate in areas which are not GPS-enabled. This is the first time that such drones are being put to use in an operation of this nature,” Cyriac Joseph, the managing director and CEO of Squadrone Infra and Mining Pvt Limited, told media.

He added that his team was tracking every activity happening inside the tunnel through the drone cameras.

“Our main objective is to bring all 41 workers out of the tunnel safely. We hope they will see the light soon,” he added.

Earlier, on Thursday, Chief Minister Dhami took stock of the rescue operation, which is believed to be in its final phase currently.
However, officials said no specific timelines for the release of the trapped workers should be assumed.

Prime Minister Narendra Modi also spoke to the Uttarakhand CM over the phone and sought updates on the ongoing rescue operation and the safe-keeping of the 41 trapped workers.

The labourers are trapped in a 2km-built portion of the tunnel, which is complete, including concrete work, thereby providing them safety.

Admin

Recent Posts

Nick Jonas Recalls Emotional Journey of Daughter Malti’s Premature Birth

In a deeply moving interview on the On Purpose podcast on February 5, 2026, singer…

3 hours ago

PM Modi Addresses Rajya Sabha Amid Chaos

On February 5, 2026, Prime Minister Narendra Modi addressed the Rajya Sabha to reply to…

4 hours ago

The 50: Karan Patel Quits After Clash With Rachit Singh?

In a shocking development for fans of the newly launched reality show The 50, veteran…

4 hours ago

Samay Raina Roasts Archana Puran Singh’s Son Over Vlog Shoutout

In a viral Instagram video shared on February 4, 2026, comedian Samay Raina delivered a…

5 hours ago

Rohit Shetty Firing Case: Mumbai Crime Branch Uncovers Advanced 7.62mm Weapon and Escape Route

New details have emerged in the investigation of the firing incident outside filmmaker Rohit Shetty’s…

5 hours ago

‘I Am Falling In Love Right Now’: Singer Talwiinder Breaks Silence on Disha Patani Dating Rumors

Singer Talwiinder, the enigmatic masked voice behind hits like Khayaal, has finally addressed the whirlwind…

6 hours ago